Interior & CMF design and component supply

Integration case

Interior & CMF design and component supply

Control, water, sanitation and pop-top systems are packaged for a van platform, followed by installation and commissioning.

Project profile

East China Converter · Van Model Optimization

Integration scope

4 systems

Delivery status

Validated

Integration brief

Designed as one vehicle system.

Project objective: Optimize Van model space utilization, enhance autonomous living capability. Integration scope: Control, water purification, sanitation, roof lift system. Delivery content: Space layout optimization plan, module integration installation, debugging test report.

Integrated systems

Scope across the vehicle.

04 / 06

01

HMT

Xbrain Control System

48V DC architecture, automotive-grade RTOS operating system, CAN bus communication. Millisecond response, intelligent energy management strategy, real-time monitoring and warning. Supports touchscreen and mobile App dual control, provides standardized API interfaces, can interface with vehicle central control system

02

HMT

Xpure Water System

Multi-stage composite purification, production rate 16L/h, filter life 2m³, TOC<5mg/L. 12V vehicle power compatible, food-grade piping, automotive-grade safety standards. Auto-flush function, real-time water quality monitoring, quick-release structure for easy maintenance, unit weight <15kg

03

HMT

Xsani Sanitation System

Microwave incineration technology, auto ash collection, sterile ash handling. 316 stainless steel inner tank ceramic coating, multi-point temperature control, microwave disinfection sterilization. Automatically selects energization time based on mixture weight, real-time monitoring display, ash box full alarm reminder for maintenance

04

HMT

Xview Structure System

Polyurethane vacuum glass window frame with a heat transfer coefficient of 0.4W/(m²·K), sound insulation of 39dB, four times the impact resistance of conventional glass, and one-sixth the weight of an aluminum frame.

Implementation evidence

From platform architecture to installed hardware.

Interior & CMF design and component supply - implementation detail 1
Interior & CMF design and component supply - implementation detail 2
Interior & CMF design and component supply - implementation detail 3

Verified outcome

Space utilization improved 40%, off-grid capability enhanced to 15 days

Discuss an integration